Lincoln Water Tower Rehabilitation Project

The City of St. Paul Park is rehabilitation the Lincoln Water Tower!

The project will rehabilitate the Lincoln Water Tower located at 1300 Lincoln Avenue. The rehabilitation includes structural repairs, sandblasting, and repainting both inside and outside the water tower. Construction is anticipated to start May 16th and to be completed by mid August. 

Exterior Containment System

A full exterior containment system (a tent-like cover) will be in place during the sandblasting and painting of the exterior surfaces of the water tower to contain the construction dust, spent sand, and paint chips. The sandblasting equipment will generate noise during the working hours of 7 AM - 7 PM. Monday through Saturday. 

Street Parking

On-street parking on the south side of 13th Avenue between Lincoln Avenue and Selby Avenue will not be allowed for the duration of the construction. Vehicles that are usually parked on the street should be moved to other nearby streets that are not under construction. Vehicle access to driveways will not be affected.

Questions

If you have any questions that are not answered here, we invite you to reach out to us using the contact information provided below.

Project Contacts:

Scott Kriese - Construction Inspector - skriese@klmengineering.com

Jon Christensen - Project Engineer - jchristensen@wsbeng.com

Jeff Dionisopoulos - Public Works Supervisor - jeff.dion@stpaulpark.org or (651) 459-3730

City of St. Paul Park, 600 Portland Avenue, St. Paul Park MN 55071